Social & Environmental

TaskCompleted YearService CostClient
Design Review and Preparation of Updated Report and IEE of Botechaur- Bhedabari- Dhuliyabit section of Madan Bhandari Highway, Surkhet, Karnali Province- 35 Km,”; Contract No: MBHPD/337011084/076/77/DPR-05.2077/10/08NRs. 1,551,700.00 (Excluding VAT)Ministry of Physical Infrastructure & Transport,Department of Roads,Madan Bhandari Highway Project Directorate, Chakupat, Lalitpur
Initial Environmental Examination of Patauli-Khrjyang-Tamghas Road (35.5 Km) in Argakhanchi and Gulmi districts.Contract No.: DOR/GESU/3371594/072/73/0032076/11/21NRs. 601,695.00 (Excluding VAT)Department of Roads,Geo-Environment &Social Unit, Chakupat, Lalitpur
Detailed Engineering Survey Design of 12 Roads in Seven Districts Including Resettlement Plan IEE & GESI Plan (MOFALD/CLPIU/EEAP/PDRF/CS-03/2073-074). Nagdhunga-Bandbhanjang-Bhimdhunga-Bhuldhunga-Ramkot, Kathmandu (11.238 Km)Santibazar-Pairegau-Thulogau-Dandagau Road, Rasuwa (12.016 Km)Gerkhutar-Chokade Road, Nuwakot (13.65 Km)Kahulethana-Mahendra Ma. Bi. -Thansingphat Road, Nuwakot (6.636 Km)Adamghat-Majuwa-Thumki Road, Dhading (16.597 Km)Waribeni Bagarchap Road, Parbat (9.961 Km)Timbu Doring Nokate Road, Sindhupalchowk (24.466 Km)Barabise Budhepa Ghorthali Road, Sindhupalchowk (10.835 Km)Tipeni Gumlepakha Gabisa Bhawan Kakani Road, Sindhupalchowk (9.293 Km)Tipeni Lapse Sunkhani Bhanjyang Danda Road, Sindhupalchowk (5.932 Km) and  Chakla-Siddhwara-Pakuri-Nayabasti-Dhankhola Road, Arghakhanchi (11.755 Km).2075/11/17    NRs. 13,518,692.62(Excluding VAT)Government of Nepal Ministry of Federal Affairs & Local Development Central Level Project Implementation Unit Earthquake Emergency Assistance Project Kupondol Lalitpur.
Environmental Impact Assessment (EIA) of Bagarkot- Chulla Road (15Km) in Dadeldhura Districts2075/02/07NRs. 750,000.00 (Excluding VAT)Government of Nepal, Department of Roads, Geo-Environment & Social Unit
Preparation of Initial Environmental Examination (IEE) study of 1. Seleghat – Ramechhap – Shagutar Road, Rammechhap (55 KM), 2. Bardibas – Jaleshwor Road, Mahottari (42 KM) & 3. Kakani – Thansing Road, Nuwakot (11 KM).2074/03/26NRs. 1,200,000.00 (Excluding VAT)Geo- Environment & Social Unit, Chakupat, Lalitpur
Preparation of Initial Environmental Examination (IEE) study of 1. Rake – Rabi – Bhedetar Road, Ilam, Panchthar & Dhankuta (101.34 KM), 2. Malanggawa Urban Road, Sarlahi (15 KM) & 3. Basantapur – Katahariya – Kawahigot – Pipradi Padam Road, Rautahat & Bara (29 KM).2074/03/26NRs. 1,130,000.00 (Excluding VAT)Geo- Environment & Social Unit, Chakupat, Lalitpur
IEE study of BhurungeKhola Bridge (Chhinchu – Jajarkot – Duani Road) Jajarkot & DolpaDhungri Khola Bridge (Tamghas – Sandhikharka – Pyuthan Road) Arghakhanchi Tadi Khola Bridge (Gangate – Tadi – Labdu – Samundratar – Golfu Road) Nuwakot. (GESU/BIMP/02/072/073)2074/03/08NRs. 820,000.00 (Excluding VAT)Geo- Environment & Social Unit, Chakupat, Lalitpur
Initial Environment Examination of Mehelkuna Lek Badakholi Road Surkhet
(DROSKT/IEE/3373354/073/74-20.
2074Government of Nepal Ministry of Physical Infrastructure & Transport Department of Roads Directorate Division Road Office Birendranagar, Surkhet 
Consultancy Services for Stage 1 Survey, Design and IEE of Sanighat- Phukot- Syuna- Shipkhana (18 Km) and Jarkot- Ramnakot section (5.5 Km) of Jarkot- Ramnakot- Thirpu- Khin- Dhaulagaha. Contract No: RAP3/2013/005.2070NRs. 2,005,672.11 (Excluding VAT)RAP 3, Rural Access Programmed 3, Ekantakuna, Jawalakhel
Socio-Economic Studies of Chauta-Shiphaghat RoadBalephi – Jalbire- Tembathan RoadMelamchi-Bhotang Road.2068/69NRs. 300,000.00Office of District Development CommitteeDistrict Technical OfficeSindhupalchowk, Nepal
Socio-Economic Studies of Chapagau-Tahakhel-Tikabhairav Road2068/05/30NRs. 149,935.00Office of District Development CommitteeDistrict Technical OfficeLalitpur, Nepal
Socio-Economic Studies of People’s Hydropower (PHP) – Baglung District2067/11/23NRs. 137,031.33 (Including VAT)Ministry of Energy, Department of Electricity Development
Assessment of Climate Vulnerable Mapping and Indexing of Pilot Districts of BRCH- AMIS Project. Contract ID No.: [PPCR/MOAD/CS/QCBS-67]2074/03/28      NRs. 3,745,950.00 (Including VAT)Building Resilience to climate Related Hazards Project. Agricultural Management Information System (Project Management Unit) Puja Pratisthan Marg Mid Baneshwor 
Baseline Survey to access User Satisfaction and Assessing Demand for Service by DHM Under PPCR: Building Resilience to Climate Related Hazards Project.2072/04/30NRs. 3,625,379.00(Including VAT)Department of Hydrology and Meteorology, Nagpokhari, Naxal
Study on Impact of Climate Change on Discharge of Major Rivers of Nepal.2072/03/22NRs. 1,680,500.00(Excluding VAT)Department of Hydrology and Metrology, Nagpokhari, Naxal