| Task | Completed Year | Service Cost | Client |
|---|
| “Consulting Services on Traffic Count, Road Roughness and Surface Distress Survey on National Highway (NH), Contract Identification No.: DORHMISICT/337310113/078/79-01” | 2079/03/15 | NRs. 19,771,000.00 (Excluding VAT) | Ministry of Physical Infrastructure and Transport, Department of Roads, Planning and Monitoring Branch, Highway Management Information & Communication Technology (HMIS-ICT) Unit |
| “Consulting Services on Traffic, Surface Distress and Road Roughness Surveys on Strategic Road Networks (SRN), Contract Identification No. (C.I.N): DORHMISICIT/337310113/076177-01 (RE)” | 2078/02/14 | NRs. 9,245,000.00 (Excluding VAT) | Ministry of Physical Infrastructure and Transport, Department of Roads, Planning and Monitoring Branch, Highway Management Information & Communication Technology (HMIS-ICT) Unit |
| Detailed Engineering Survey of Ring Road Proposed Budhigandaki Hydro Power Project and Demarcation of its Reservoir in Gorkha District; Job No: BGHEP/074/75/01” | 2078/03/10 | NRs. 24,40,900.00 (Excluding VAT) | Ministry of Energy, Water Resources and Irrigation, Budhigandaki Hydropower Project,Environment, Compensation distribution, settlement & Rehabilitation unit,Gandaki Rural Municipality, Gorkha |
| Detailed Engineering Survey, Design and Report Preparation of Undermentioned roads under Contract No. PMEU/33701123/076/77/DPR-13. | 2078/03/21 | NRs. 66,55,800.00 (Excluding VAT) | Ministry of Physical Infrastructure and Transport, Department of Roads, Planning and Monitoring and Evaluation Unit (PMEU) |
| Detailed Engineering Survey, Design and Report Preparation of Undermentioned roads under Contract No. PMEU/33701123/076/77/DPR-22 | 2077/10/22 | NRs. 53,00,795.00 (Excluding VAT) | Ministry of Physical Infrastructure and Transport, Department of Roads, Planning and Monitoring and Evaluation Unit (PMEU) |
| “Detailed Engineering Survey, Design and Report Preparation of Lalitpur Pahadi Ring road (Bhattedanda Malta Pityutar- Aashram- Gimdi- Thula Durlung- Gotikhel- Chamei- Gupha), Lalitpur (54.93 Km) Rimna- Gharaghat- Jhula- Ghetma Road, Rukum (40.05 Km).Under Contract No. PMEU/337159/074/75 DPR-17. | 2075/08/27 | NRs. 1,986,000.00 (Excluding VAT) | Department of Roads, PMEU |
| “Detailed Engineering Survey, Design and Report Preparation of Botechaur- Surkhet Section of Tulasipur-Purandhara- Surkhet Road, Surkhet (37.00 Km)Bheriganga Na. Pa Brihat Ring road, Surkhet (39.74 Km) andPawanpur Hepo Debisthan Surkhetkot Mandir Road, Dang (19.37 Km) Under Contract No. PMEU/337159/074/75 DPR-9. | 2075/08/27 | NRs. 1,891,460.00 (Excluding VAT) | Department of Roads, PMEU |
| “Detailed Engineering Survey, Design and Report Preparation of Kamalamai Na. Pa. Ring road Sindhuli (8.30 Km)Pyuthan Ring road Pyuthan (33.52 Km) andJhimruk Ring road Pyuthan (55.782 Km)Under Contract No. PMEU/337159/074/75 DPR-13. | 2075/08/27 | NRs. 1,824,000.00 (Excluding VAT) | Department of Roads, PMEU |
| “Detailed Engineering Survey, Design and Report Preparation of Chakla Jaluke Durbang Baraula Road, Arghakhanchi (45.97 Km)Bhalubang Nuwakot Sandhikharka Tamaghas Kharbang Road, Arghakhanchi (33.58 Km) andBanglapur Phurkesalli Bhalai Habe Road, Dang (19.94 Km)Under Contract No. PMEU/337159/074/75 DPR-10. | 2075/08/02 | NRs. 6,582,750.00 (Excluding VAT) | Department of Roads, PMEU |
| Detailed Engineering Survey, Design, Cost Estimate of Perimeter Road and River Training Works around the Second International Airport and Preparation of Detail Project Report.Contact No.: CAAN/NPP/SIA-IU/RFP/Road/2074-075 | 2075/03/25 | NRs. 1,484,400.00 (Excluding VAT) | National Pride Project, Sinamangal, Kathmandu |
| Detailed Engineering Survey, Design, and Preparation of Detailed Project Reports (DPR) of Karaputar- Daduwa- Gilung- Salmebhanjyang Road, Lamjung District (23.15 Km). Contract No.: P-02-SNRTP (W2) – DTO- LMG- KDGS- 072/73. | 2075/03/15 | NRs. 1,093,786.27 (Excluding VAT) | District Coordinate Committee, DTO, Lamjung |
| “Detailed Engineering Survey, Design and Report Preparation of Bayarghari- banethok Deurali- Biruwa Road, Syangja (23.00 Km) Tillotama Ring Road (Shankarnagar-karhiya-Makrahar-Gangoliya-Madhbalya-Tikuligadh-Aanadban-Shankarnagarr) Rupandehi (45.48 Km)Tansen Chandibhanjyang Jorte Ridi Road, Palpa (19.430 Km)Sagarbus kaileni Madibesi Road, Kaski (21.88 Km) andRijal Chowk Amarbhumi Majhkharka Darma Bhaise Midhill Road, Baglung (23.00 Km) | 2075/03/05 | NRs. 8,339,800.00 (Excluding VAT) | Department of Roads, Planning, and Design Branch, PMEU |
| Consulting services for Environment Impact Assessment (EIA) of Bagarkot Chulla Road, Dadeldhura as per our terms of reference (TOR) Contact No: DOR/GESU/3371234/071/72/007 | 2075/02/14 | NRs. 847,500.00 (Including VAT) | Government of Nepal, Department of Roads, Geo-Environment & Social Unit |
| Environment impact assessment (EIA) of Bagarkot chulla road (15 km) in Dadeldhura Districts. | 2075/02/07 | NRs. 750,000.00 (Excluding VAT) | Government of Nepal, Department of Roads, Geo-Environment & social Unit |
| Detailed Engineering Survey Design of Road & Report Preparation (DPR) of Road (PMEU/337159/073/74 DPR-15).Banauli Kabilasa Bhutahi Kushaha Boarder Road, Saptari, 15 km.Gaira Mudhbhara Sadak, Doti, 18KmDailekh Bajar Dekhi Unnapata Section of Dailekh Bajar Mahabu Kalikot Sadak, Dailekh, 30KmResunga Koridor, Gulmi, 14KmJogbuda Rupayal Bhageshwarhudai Melauli Sadak, Dadeldhura, 18kmSadakpur Bauniya Jhabahi Tapapur Mohana (Mariyaghat) Bhansar Road, Kailali, 30 Km. | 2075/01/21 | NRs. 7,743,350.00 (Excluding VAT) | Department of Roads, Planning, and Design Branch, PMEU |
| Detailed Engineering Survey Design of Road & Report Preparation (DPR) of Road (PMEU/337159/073/74 DPR-38).Richoktar Laamidanda Chitwan Sadak, Dhading, 15 Km.Basurti Dada Katheri SaktiU.Ma.Bi. Sadak, Nuwakot, 11 KmAurahiya Bankul Himalibas Sadak Nijgad Sadak Rautahat, Bara, Rautahat, 15KmHulak Bhanjyang Chainpur Bungkotghat Sadak, Dhading, 14KmPalpa Bhanjyang Maidai Osho Ashram Marg, Dhading, 15 Km Labhdu Hallechokte Sadak, Nuwakot, 30 Km. | 2074/10/09 | NRs. 6,885,000.00(Excluding VAT) | Department of Roads, Planning, and Design Branch, PMEU |
| “Detailed Engineering Survey, Design and Preparation of Detailed Project Report (DPR) of Roads of Tamaghas-Sandikharkha Section (43.2 Km)Sandikharkha-Gorusinghe Section (67.8 Km)Contract ID: PMEU/337365/073/74 DPR2 | 2074/03/23 | NRs. 8,158,500.00 (Excluding VAT) | Department O Roads, Planning and Design Branch, Planning, Monitoring, and Evaluation Unit, Chakupat, Lalitpur |
| Detailed Engineering Survey Design of Cyclechowk Chuchunadevi Thapathana Bhangara Road, Prabat. | 2074/03/15 | NRs. 422,625.00(Excluding VAT) | Office of District Coordination Committee, Parbat |
| Detailed Engineering Survey, Design Drawing Cost estimate and preparation of Detail Project report (DPR) of Katahari-laxminiya-tarigama | 2074/02/10 | NRs. 713,941.20(Excluding VAT) | Office of District Development Committee, District Technical office |
| Part A: Comprehensive Manual for Quality Dense Bituminous Macadam (DBM)/ Hot Mixed asphalt concrete (HMA). Part-B: Preparation of standard Drawing of Pedestrian Bridge at Level (Better & safe Pedestrian facilities) MB/3371654/073/74/RD-2. | 2074 | NRs. 840,000.00 | Department of Roads, Maintenance Branch |
| Detailed Engineering Survey Design of Road & Report Preparation (DPR) of Road Chapagaun- Pyagagaun- Lele Tileswore Kunda (7.0 km). | 2074 | | Government of Nepal Ministry of Physical Infrastructure & Transport Department of Roads, Kathmandu Valley Road Improvement Project |
| Detailed Engineering Survey, Design, and Report Preparation ofManakamana Phikuri Satdobato Kaule Bhalche Saalma Road, Nuwakot (33.14 Km)Tansen Ringroad – Barangdi – Khanigaun – Dailatum, Syangja, Palpa, (13.215 Km)Nagtar – Heltar Sadak, Lalitpur (30.59 Km) andDumja Marinkhola Kapilkot Lalbandi Sadak, Sindhuli, Sarlahi (58.11 Km). Contract ID: PMEU/337159/072/73-DPR-25. | 2074/01/10 | NRs. 9,993,700.00 (Excluding VAT) | Department of Roads, Planning, and Design Branch, PMEU |
| Detailed Engineering Survey, Design, and Cost Estimation Report of Shankhamul – Korbagjhimpe Rural Road (CH: 0+000 to 9+000) in Salyan District in Fiscal Year 2073/74. | 2073/12/25 | NRs. 6,91,560.00 (Including VAT) | Office of District Co-ordination Committee, District Technical Office, Salyan |
| Detailed Engineering Survey, Design, Cost Estimate, and Report Preparation of Helu – Arjunchaupari – Rapakot Naudanda – Karkineta Badhkhola – Taxar – Dulegauda Mirdi – Jagatbhanjyang Walling – Huwas Rural Road. (Length 41 Km). | 2073/03/25 | NRs. 19,27,000.00 (Excluding VAT) | DDC, DTO, Syangja |
| Preparation of Detailed Project Report (DPR) i) Detail Engineering Survey and Investigation and ii) Detail Design, Drawing and Cost Estimate of Babiyachaur Junjlaghat Road (0+000 to 12+000), Surkhet District under SNRTP Programmed. (Length of Road = 12 Km). | 2073/03/20 | NRs. 8,44,800.00(Excluding VAT) | Office of District Development Committee District Technical Office, Surkhet |
| Detailed Engineering Survey, Design, and Report Preparation of Double Lane Road of Beluwa chowk to Karnali Bridge, Bardiya District. (Length 23 Km) (Contract ID No.: HRP/3372244/072/73-DPR-041). | 2073/02/32 | NRs. 851,000.00 (Excluding VAT) | Department of Roads,Postal Highway Project |
| Detailed Engineering Survey, Design, and Preparation of Detailed Project Report (DPR) of N-S Lokmarga Mahakali Corridor (Tanakpur Jhulaghat Darchala) (Ch. 245+516 – 290+981) (Contract No.: ACQMP/337145/2072/73-002) (Length 45.465 Km). | 2073/02/25 | NRs. 13,64,700.00 (Excluding VAT) | DOR, ACQMP, Babarmahal, Kathmandu |
| Detailed Engineering Survey, Design, Cost Estimate, and Report Preparation works of Jyagdi Corridor Road. (Length 32.173 Km) (Contract ID No.: DDC Syangja/CW/R/01). | 2073/02/10 | NRs. 893,000.00 (Excluding VAT) | DDC/ DTO, Syangja |
| Pre-Feasibility Study of Aandhi Khola Corridor. (Road Length = 80 Km). Contract ID: DDC Syangja/CW/R/03. | 2073/02/10 | NRs. 3,05,000.00 (Excluding VAT) | DDC, DTO, Syangja |
| Bus Rapid Transit (BRT) in Parwanipur – Pathalaiya Section – 15 Kms, Bara. | 2073 | NRs. 4,23,750.00 (Including VAT) | Department of Road, Byaparik Margh Bistar Yojana Birjung – Pathalaiya Sadak, Pathalaiya, Bara |
| Detailed Engineering Survey, Design, and Preparation of Detailed Project Report (DPR) of six lane Birjung Pathalaiya Road to ICP (Parmanipur to Sirsiya dry port). (Length = 10.935 Km). Contract No.: ACQMP/3373124/2072/073-003. | 2072/12/18 | NRs. 481,800.00(Excluding VAT) | Department of Roads, ACQMP |
| Detailed Engineering Survey, Design, and Report Preparation of:Jiri Sikri – Hawa Kirne Road, Dolakha, Ramechhap District (40.48 Km) and Dukuchap VDC – Debichaur Ghusele Malta Baguwa to Makawanpur (Kantilok path), Lalitpur (31.33 Km). Package No.: 337159/071/72-DPR-3 | 2072/11/16 | NRs. 5,920,000.00 (Excluding VAT) | Department of Roads, Planning, and Design Branch, PMEU |
| Detailed Engineering Survey, Design, and Report Preparation of Packages:Chitwan PipleGadauli Parewakot Chepangmarg (5.11 Km) Nawalparasi Ghosarghat (Narayani River) Magarkot (8.58 Km)Nawalparasi Bishnunagar Bulingtar (34.83 Km) andTanahnu Gomantal Bulingtar (25.88 Km) | 2072/09/26 | NRs. 2,169,900.00 (Excluding VAT) | Department of Roads |
| Detailed Engineering Survey, Design and Report Preparation of Four (4) Lane Road of Janakpur – Jaleshwor – Birtamod Road, Dhanusha and Mohatari District (18.75 Km). (Contract ID.: HRP/3372244/071/72- DPR-001). | 2072/04/28 | NRs. 787,500.00 (Excluding VAT) | Hulaki Rajmarg Project, Aaloknagar, Minbhawan |
| Feasibility Study of Bhairagi Thati Kaaekhola Nuwakot Danda Kholagau Chaurjhari Road, Rukum (39.97 Km). | 2072/05/20 | NRs. 692,125.00(Including VAT) | Department of Roads, Planning, and Design Branch, PMEU |
| Detailed Engineering Survey, Design, and Preparation of Detailed Project Report (DPR) of North South Lokmarga Mahakali Corridor. (Tanakpur-Jhulaghat-Darchala, Baitadi and Darchula District). (Contract No.: ACQMP/337145/071/72/001) (Length 95.516 Km). | 2072/03/30 | NRs. 3,343,060.00 (Excluding VAT) | DOR, ACQMP, Babarmahal, Kathmandu |
| Detailed Engineering Survey and Design of Putalikhet – Aaruchaur Mirdi – Jagatbhanjyang – Chapakot – Damachaur and Ghumti – Chisapani Rural Road (Length 32.8 Km) and Preparation of Detailed Project Report (DPR). | 2072/03/25 | NRs. 1,261,360.00 (Excluding VAT) | DDC/ DTO, Syangja |
| Detailed Engineering Survey, Design, Cost Estimate, and Report Preparation of Jalbire Yakrang Chandibhanjyang – Ichhakamana Road (31.28 Km), Chitwan District. (Contract ID No.:17/071/72 DDC Chitwan) | 2072/03/15 | NRs. 499,800.00 (Excluding VAT) | DDC, Bharatpur, Chitwan |
| Detailed Engineering Survey, Design, and Cost Estimation for Construction of Majhigaun – Aaatichaur to Thamlekh Road, 32.951 Km in Bajura District under DRILP-AP. (Contract No:269/2014) | 2072/03/25 | NRs. 1,779,354.00 (Excluding VAT) | Decentralized Rural Infrastructure and Livelihood Project (DRILP) |
| Detailed Engineering Survey, Design, and Cost Estimation of Luham – Kavra – Rampur Road (CH: 00+000 to 12+000) in Salyan District in the Fiscal Year 2071/072. (12 Km) | 2072/01/22 | NRs. 660,000.00(Excluding VAT) | Office of District Development Committee District Technical Office, Salyan |
| Detailed Engineering Survey and Design of Kaligandaki Corridor (Gaindakot – Rampur – Pipaldanda), 130km and Preparation of Detailed Project Report (DPR), Nawalparashi and Palpa District | 2071/03/29 | NRs. 5,141,500.00(Including VAT) | Department of Roads, ACMQCP |
| Detailed Engineering Survey, DCP Test, Design of Roads, Concise IEE study and preparation of Detailed Project Report of Pokhara Ring Road (80.9Km), Kaski District | 2071/03/25 | NRs. 3,461,870.00(Excluding VAT) | Department of Roads, Planning, and Design Branch, PMEU, Babarmahal, Kathmandu |
| Feasibility Study of Jiri-Sikri Hawa Bhirkot Kirne Road, 49 Km (Dolakha/ Ramechhap) | 2071/02/13 | NRs. 607,500.00(Excluding VAT) | Department of Roads, PMEU |
| Detailed Engineering Survey, Design, and Cost Estimate of Jiri-Salleri-Dhingri (Tibet Boarder) Road (Road Length = 15.10 Km) | 2070 | NRs. 850,460.60 (Including VAT) | Division Road Office, Charikot, Dolakha |
| Road Safety Inspection Work at Araniko Highway, Dolalghat-Kodari Section (57+000 -112+000). | 2070/11/28 | NRs. 258,308.11 (Including VAT) | Department of Roads |
| Feasibility Study of Tamghas-Simaltari-Pyuthan Road, 60 Km ( Gulmi-Pyuthan) | 2070/3/20 | NRs. 750,000.00(Excluding VAT) | Department of Roads, PMEU |
| Detail Engineering Survey, Design, and Cost Estimate of Jiri-Salleri-Dhingri (Tibet Boarder) Road, 30 Km. | 2070/03/20 | NRs. 600,000.00(Excluding VAT) | Department of Roads, ACMQCP |
| Detailed Engineering Survey:Inventory survey, traverse survey, level survey and topographical survey and design leguwaghat-Bhojpur Road, length 65.4 km.Inventory survey, traverse survey, level survey and topographical survey and design of leguwaghat-tumlingtar road, length 26.5 km.Inventory survey, traverse survey, level survey and topographical survey and design of Rampur-Lumbini-karkarhawa road, length 34.7 km.Traverse survey, level survey and topographical survey and design of ridi-rudrabeni-wamitaksar road, length 47.396km.Inventory survey, traverse survey, level survey and topographical survey and design of Tulsipur (Dang)-purandhara-Botechaur(surket) road, length 78.085 km.Feasibility study and inventory survey of Bhedetar – Rajarani-ranke road, length 99.028 km.Feasibility study and inventory survey of Ramechhap- Okhaldhunga road, length 108.485 km. | 2069/70 | NRs. 6,801,271.00(Excluding VAT) | Silt consultants |
| Feasibility Study of Triveni-Kalikasarmi Road (Dolpa and Jumla District) (Tourist Road Corridor), Contract No. -4/PMEU-Feasibility-Tourist/068/69 (Length = 75.12 km) | 2069/04/32 | NRs. 189,000.00 (Excluding VAT) | Department of Roads, PMEU |
| Feasibility Study of Dudharaksha 3-Mauravchowk – Balapur – Juthapani (Rupandehi and Palpa district), Contract No. -4/PMEU- Feasibility – Regional/ 068/69. (Length = 36.87 Km). | 2069/04/32 | NRs. 541,620.30 (Including VAT) | Department of Roads, PMEU |
| Detail Engineering Survey, Design, and Cost Estimate of Barpak Gumda Machhekhola Road (11+000 to 26+100), Gorkha. (Length = 15.10 Km). | 2068/69 | NRs. 476,023.00(Including VAT) | DOR, 11 Kilo Chhepetar Bhaluswanra Barpak Project, Gorkha |
| Detailed Engineering Survey, Detailed Design, and Cost Estimate ofJaitkot – Kolsya – Tursadi – Huti Road, Darchula (7.9Km)Lali Bagaura – Ballekhdhar – Pautoli – Areechana Road, Darchula (7.6 Km) | 2067/03/28 | NRs. 718,115.00(Including VAT) | Department of RoadF.W. Division Road Office No. 3 Patan |
| Detailed Engineering Survey, Detailed Design, and Cost Estimate of Internal Road of Chameliya (Chhettigad) Hydroelectric Project. (17 Km). | 2067/68 | NRs. 190,000.00 (Excluding VAT) | Hydro Vision Company (P) Ltd., Lazimpat, Kathmandu |
| Preparation for the Detailed Engineering Survey, Design, and Cost Estimate of Mudku, Aathmaiel-Dhande and Ghattekhola Bhancharedanda Road. | 2067/068 | NRs. 310,750.00(Excluding VAT) | Solid Waste Management and Resource Mobilization Center |
| Detailed Engineering Survey, Detailed Design, and Cost Estimate of Saljhandi – Sandikharka – Dhorpatan RoadTimile Gau (Argakhachi) to Darling Daha (Gulmi) Road Package 1 (20.1Km)Darling Daha (Gulmi) to Boharagau (Baglung) Road, Package 2 (20.1 Km) | 2067/68 | NRs. 999,372.00 (Including VAT) | Department of RoadSaljhandi-Safebagar-Dhorpatan Road Project Sandikharka, Argakhanchi |
| Detailed Engineering Survey and Design of Shankar Chowk to Mahendra Chowk Road at Chitwan (8 Km) | 2067/68 | NRs. 99,440.00(Including VAT) | Office of District Development CommitteeDistrict Technical Office, Bharatpur |
| Detailed Engineering Survey and Design of Simle Bhorle Parchang Road Section (CH 4+000 to 8+000) at Rasuwa District (4 Km) | 2067/68 | NRs. 149,000.00(Including VAT) | Office of District Development CommitteeDistrict Technical Office, Dhunche |
| Detailed Engineering Survey and Design of Syaubari to Yarsha Road at Rasuwa District (15 Km) | 2067/68 | NRs. 542,400.00(Excluding VAT) | Office of District Development CommitteeDistrict Technical Office, Dhunche |
| Detailed Engineering Survey, Detail Design, Cost Estimate, and Preparation of Report of Rampur –Prapcha – Shri Chaur Road Section (CH 3+500 to 7+000 Km). | 2067/68 | NRs. 143,495.31(Including VAT) | Office of District Development CommitteeDistrict Technical Office, Okhaldhunga |
| Detailed Engineering Survey and Design of Road Periphery Road at the Approach Light Area (Approx. 4 Km)Project Code: CMD/TIACAO | 2066/67 | NRs. 149,600.00 (Including VAT) | Civil Maintenance Division (CMD)Tribhuvan International Airport Civil Aviation Office (TIACAO) Gaucharan, Kathmandu |